NFK Glazing & Industrial Supplies Home
NFK Small Joint Sealant, 20L Drum

NFK Small Joint Sealant, 20L Drum

Login For Pricing(inc GST)

 

NFK SMALL JOINT SEALER 20L

Sealing of small mitre joints in the manufacture of aluminium window joinery. Effective at eliminating corrosion of joints due to oxidization at clean and fresh edges. Can be used for interiors/exteriors.

Packaging: 20 Litre can

Colour: Clear (transparent)

FEATURES & ADVANTAGES:

  • Excellent ageing resistance
  • Good flexibility

SURFACE PREPARATION
Always ensure that the surfaces to be sealed are dry and free from oil, dirt, and grease. For impervious substrates, use the two-wipe cleaning process. Ensure that clothes are clean and changed frequently. Use a suitable cleaner.
APPLICATION
Transfer sealant to a clean application bottle or sealant gun. Apply a continuous bead of sealant to the joint surfaces. Work sealant into the joint to exclude air bubbles and ensure a full seal is obtained. Allow to dry for a minimum of 4 hours. Low temperatures and high humidity will lengthen drying time.

Product Code: 29-SJNFK200-20

Documents:

Safety Data Sheet




Related Products

NFK Small Joint Sealant, 20L Drum

Product Code: 29-SJNFK200-20

Category: Glazing Tools and Accessories / Sealant and Adhesives

Weight: 0

Description:

NFK SMALL JOINT SEALER 20L

Sealing of small mitre joints in the manufacture of aluminium window joinery. Effective at eliminating corrosion of joints due to oxidization at clean and fresh edges. Can be used for interiors/exteriors.

Packaging: 20 Litre can

Colour: Clear (transparent)

FEATURES & ADVANTAGES:

  • Excellent ageing resistance
  • Good flexibility

SURFACE PREPARATION
Always ensure that the surfaces to be sealed are dry and free from oil, dirt, and grease. For impervious substrates, use the two-wipe cleaning process. Ensure that clothes are clean and changed frequently. Use a suitable cleaner.
APPLICATION
Transfer sealant to a clean application bottle or sealant gun. Apply a continuous bead of sealant to the joint surfaces. Work sealant into the joint to exclude air bubbles and ensure a full seal is obtained. Allow to dry for a minimum of 4 hours. Low temperatures and high humidity will lengthen drying time.